Sign up to receive a text message or email when new bids are added!
Bid Number: 22043
Bid Title: Sterling Drainage Improvements
Category: Construction Services Various
Status: Open
Additional Status Information: IFB has been extended one month due to no response.
Bid Recipient: Resden Talbert, Procurement Officer, rtalbert@glynncounty-ga.gov

Description:

Work to Be Done: The successful Bidder shall provide all skill; labor, materials, and equipment for the instillation of storm drain pipe and associated structures to replace existing storm systems under Chris Road and Hinson Lane at the Sterling Drainage Ditch (near the intersection of Hwy 99 and Hwy 341).   The work will require construction of lane shifting, traffic control, Erosion and Sediment Control removal of existing asphalt and base, installation of storm infrastructure in 2 locations, backfill, repaving, and stabilizing the disturbed area.  The majority of the project will be conducted in the County’s Drainage Easement.  All work shall be in accordance with the construction drawings and technical Specifications, if any.  All materials shall conform to the specifications contained in the Technical Specifications, if any.

Publication Date/Time:
6/10/2022 12:00 PM
Publication Information:
IFB has been extended one month due to no response.
Closing Date/Time:
7/12/2022 2:00 PM
Contact Person:
Resden Talbert
Business Hours:
Mon - Fri 8:00 AM - 5:00 PM
Qualifications:
THIS PROJECT QUALIFIES AS A “HORIZONTAL PROJECT” (SEE QUESTION #8 IN THE PRE-QUALIFICATION PACKET CONCERNING ROAD, DRAINAGE, AND BRIDGE PROJECTS. THIS WILL EXPLAIN THE USE OF CURRENT DOT CERTIFICATION FOR THE PROJECT) AND DOES REQUIRE PRE-QUALIFICATION. PRE-QUALIFICATION QUESTIONNAIRES AND PRE-QUALIFICATION CRITERIA MAY BE DOWNLOADED AT www.glynncounty.org PRE-QUALIFICATION QUESTIONNAIRES MUST BE RECEIVED NO LATER THAN 5 p.m., EST Tuesday July 5th, 2022.

Related Documents:

Return To Main Bid Postings Page